Errata for
First Printing of
Production and Operations Management: An Applied Modern Approach
by
Joseph S. Martinich
(6/17/97)
This list only contains corrections to misprints that would be confusing if not corrected; simple misprints, such as transposed letters, words not
italicized, etc., are not listed.
Page |
Line |
Correction |
ix |
22 in col 2 |
"IMB" should be "IBM" |
53 |
7 |
"page 00" should be "page 29" |
88 |
Figure 3.6 |
"Delivery between hub regions" on left side of Figure should be "Delivery within hub region" |
131 |
14 |
"St" should be "S2" |
189 |
Table T1.8 |
"-4,000" in bottom right of table should be "-40,000" |
191 |
4 in col 2 |
"XXX" should be "QS for WINDOWS" |
198 |
last in col 2 |
"198" should be "172" |
227 |
Figure 5.6 |
Caption for (b) should be "Robust", not "Robert" |
230 |
Figure 5.8 |
There should be a circle corresponding to
"strong relationship" in the third customer
requirement row/second technical attribute
column (same as in |
249 |
4 of shaded box |
The (0.2) values in the Reliability column should be (0.02). So the total reliability equation should be:"[1-(0.02)(0.02)(0.02)] x 0.99 x 0.97 x 0.95 x 0.97 = 0.885" {The three terms (0.02) were originally printed incorrectly as ().2).} |
249 |
12 of problem 6 |
"probability" should be "reliability" |
315 |
7 of col 1 |
"-" sign on far right should be "+" sign |
444 |
Figure 9.8 |
"l1" in Sales dept. should be l2" |
461 |
Figure 9.15 |
"M/M/1" in caption should be "M/D/1" |
500 |
Last within tan box at top |
"policy 1" should be "policy 2" |
555 |
Figure 10S.2 |
"Actual date" should be "Actual data" |
591 |
Table 11.5 |
Under the column heading "Sample Mean" the capital X should have a bar over it as follows: ""The values in the sample no. 7 line should be: "7 351.2 351.3 350.9 350.9 351.075 0.4"The line for sample no. 8 is missing. The line
should read: In the second line from the bottom the capital X should have two bars above it (as in the footnote at the bottom of that page), and its numerical value is incorrect; it should be 350.990. |
609 |
Table 11.8 |
In sample 5 the third observed time should be "13" not "23" |
632 |
Table 12.4 |
Last three lines should read: |
633 |
Table 12.4 |
Costs should read: |
635 |
1 |
">" should be ">" |
636 |
5 |
below example "358" should be "359" |
851 |
Table 17.2 |
Rows for tasks I and J are reversed in order |
865 |
24 |
"latest finishing (LS)" should be "latest finishing (LF)" |
875 |
Figure 17.19 |
Arrow between F and M should be deleted; arrows from F to L and from H to I should be added |
A6 |
ch 8, prb 1(d) |
"P=1108" should be "P=1200" |
A7 |
ch 8, prb 13(a) |
In column labeled 7, delete X in row A, add X in
row B |
A8 |
Ch 11 supp, prb 3 |
"0.8781" should be "0.8088" in both the table and the figure |
page |
line |
correction |
15 |
prob 4(a) |
The units for the axes are missing. The |
39 |
prob 4(a) |
The data point on the y-axis should be |
62 |
3 |
from bottom 3500 should be 3000 (this is
correct in |
151 |
Table |
The positional weight for Task A should be "95", not "97" |
161 |
problem 13 |
delete the X in row A of column labeled "7"; add X in row B of column labeled "7" |
162 |
2-3 |
The line should read: "(b) The solid lines |
255 |
10 |
The term "/4=2" should be "/=2" |
259 |
last of prob 12 |
"RP =20 is better" should be "RP = 16 is better." |
Copyright 1997, John Wiley & Sons, Inc.